Material Register / RM-WTR-0406
Material Lot No.
RM-WTR-0406
Purified Water · Process Aid · In-house · 50 L received 10-Mar-2026
Received
50 L
Dispensed (live)
0 L
Remaining
50 L
RELEASED

Document Trail

Full per-material lifecycle: Procurement → QA → Warehouse → Supplier → QC → Lab → QC → QA. Nine documents, in order, each owned by a named department.

  1. 1Purchase OrderProcurementCOMPLETE
    Doc IDPO-INT-WTR-06
    Date03-Mar-2026
    Detail50 L of Purified Water ordered from In-house.
  2. 2AVL CheckQAAPPROVED
    Doc IDAVL-QA-INT
    Date03-Mar-2026
    DetailIn-house verified on Approved Vendor List prior to receipt.
  3. 3GRN (Goods Receipt Note)WarehouseCOMPLETE
    Doc IDGRN-2026-0406
    Date10-Mar-2026
    Detail50 L received; container seals intact; quarantine label affixed.
  4. 4Supplier COASupplierCOMPLETE
    Doc IDWTR-LOG-2026-031
    Date10-Mar-2026
    DetailManufacturer's certificate of analysis received with the consignment.
  5. 5Sampling + Under-Test LabelQCCOMPLETE
    Doc IDQC-SAMP-0406
    Date10-Mar-2026
    DetailSampling per SOP-QC-SAMP-04; UNDER TEST (yellow) label affixed pending analysis.
  6. 6ARF (Analytical Request Form)QCCOMPLETE
    Doc IDARF-QC-0406
    Date10-Mar-2026
    DetailQC raised analytical request to lab — Identification, Assay, Moisture, Particle Size.
  7. 7ATR (Analytical Test Report)LabPASS
    Doc IDATR-QC-0406
    Date14-Mar-2026
    DetailAll parameters within specification.
  8. 8In-house COAQCPASS
    Doc IDQC-COA-0406
    Date14-Mar-2026
    DetailQC issued PASS COA based on ATR results.
  9. 9QA ApprovalQARELEASED
    Doc IDQA-REL-0406
    Date14-Mar-2026
    DetailReleased for manufacturing by Priya R. (QA).

Used in Batches

Two-way traceability: from this lot, jump into every batch that drew from it.

Batch No.Qty Dispensed
ZBL-2026-00134.8 LOpen batch Stage 1 →